Contact Kecai
Tell us your resin, application, target color and order requirements.
Talk to Our Team
Send your color reference, base resin and processing method. Our team will help you choose a suitable masterbatch or modified material.
- 40 meters northwest of Tongwang Road and Qingyuan Road, Wuqing District, Tianjin, China
Request a Material Recommendation
Ordering & Sampling FAQ
What is the minimum order quantity?
The reference MOQ is 1 metric ton. Confirm the selected grade and color with our team.
What are the payment terms?
30% deposit, with the remaining 70% paid before shipment.
What is the lead time?
Custom production typically takes 4–5 weeks; available stock typically takes 3–4 days. Confirm availability and timing before ordering.
Can you match a custom color?
Yes. Provide your resin, application and a color reference or sample. Sample matching is available; customers cover courier charges.